Operation Statistics

Text Size : + - r
Bookmark and Share
Home > Industries > Facts & Figures > Operation Statistics

See details of the statistics related to Power System Operation. System Demand, Electricity Generated (GWHr), Generating Plants Availability, Transmission System Availability and Load Centre Demand can be viewed in this section.

System Demand

System demand profile chart for the year.

 

Electricity Generated

Total monthly electricity units generated.

http://ww.ema.gov.sg/charts/index/1

Total annual electricity units generated.

http://ww.ema.gov.sg/charts/index/2

Generating Plants Availability

Installed capacity of the month.

http://ww.ema.gov.sg/charts/index/3

Planned outage capacity of the month.

http://ww.ema.gov.sg/charts/index/4

Remaining capacity of the month.

http://ww.ema.gov.sg/charts/index/5

Transmission System availability for the Month

http://ww.ema.gov.sg/charts/index/6

Load Centre Demand

Monthly Demand. The data will be uploaded monthly in graphical format.

Dec 11

  • Max Demand
  • Ave Demand
  • Min Demand
  • 1511
  • 1247
  • 943
  • Max Demand
  • Ave Demand
  • Min Demand
  • 1580
  • 1048
  • 531
  • Max Demand
  • Ave Demand
  • Min Demand
  • 1537
  • 1240
  • 971
  • Max Demand
  • Ave Demand
  • Min Demand
  • 1908
  • 1413
  • 964